新闻资讯

联系我们

  • 销售地址:广东省东莞市万江莞穗大道122号
  • 工厂地址:广东省东莞市万江石美新洲工业区57号
  • 电话:0769-22780565
  • 手机:13825740256
  • 联系人:陈先生
  • 邮箱:tenj999@163.com
您的位置: 首页 >>

【What is the correct procedure for using the tunnel furnace?】

  • 来源:beat365官方网站
  • 发布日期:2019-11-28
  • 访问量:39

What is the correct procedure for using the tunnel furnace?

1. Put other test objects into the tunnel furnace only after the ready side is ready for all the preparations in advance. Then connect and turn on the switch power supply. The bright red indicator light indicates that the furnace has been warmed up. When the temperature reaches the controlled temperature, the green light blows out the signal light, and the temperature control is just started. In order to avoid the ineffective temperature control, you must also take care of it;

2. When placing other test objects, pay attention to the order not too dense, and do not place test objects on the heat pipe heat sink to prevent the heat flow from entering the upper mobility. It is strictly prohibited to bake inflammable, explosive, volatile and corrosive objects;

3. In the whole process of heating and temperature control for the tunnel furnace with wind drenching, it is necessary to turn on the blower motor, otherwise it will endanger the temperature uniformity of the personal studio and destroy the heating components;

4. When the tunnel furnace is applied, the temperature shall not exceed the maximum application temperature of the tunnel furnace, and it shall be placed in the dry and level place in the room to avoid vibration and erosion;

5. Pay attention to the safe use of electricity, install switch power knife with sufficient volume according to the output power of tunnel furnace consumption, adopt sufficient switch power transmission line, and have excellent wire connector;

6. If the tunnel furnace contains an electric contact mercury thermometer type temperature controller, the two transmission lines of the electric contact thermometer shall be respectively led to two terminals on the furnace wall, the hole of the automatic exhaust valve shall be opened, another general mercury thermometer shall be inserted into the automatic exhaust valve, and the screw on the steel cap shall be tightened after the electric contact mercury thermometer is adjusted to the required temperature, so as to achieve the goal of temperature control, but it must be kept Never screw the marking iron out of the scale when adjusting.


推荐产品 更多
友情链接
友情链接/ lins
beat365官方网站入口
beat365官方网站入口
销售地址:广东省东莞市万江莞穗大道122号
电  话:0769-22780565
传  真:0769-22705089
手 机:13825740256
联 系 人:陈先生
工厂地址:广东省东莞市万江石美新洲工业区57号
beat365官方网站入口

beat365官方网站是工业烤箱,真空烤箱,小型实验烤箱,工业烤箱生产厂家,工业烤箱价格公道,设备节能省电,经久耐用,17年品牌积累,欢迎名客户来厂实地考察,我们将竭诚为您服务.

Copyright © 2018-2020 beat365官方网站 All Rights Reserved. 如有侵权请告知,我们会快速处理         技术支持【源友网络 · 企业网站定制】        网站备案号:粤ICP备15039104号